Project Details

  • Year of Installation: 2022
  • Residential Net Metering, EV Charger
  • Project scope of work: Solar, Leviton EV Charger
  • 15.1kw DC power with SolarEdge Inverter
  • Approximately 80% of the buildings energy will contribute to a greener, more stable hydro grid, and positively influence the community